Archives

 
Enertech Issue No:19

December 2004-January 2005


Tenders


1.








Laying of Gas Pipeline of 42” dia and 52” dia from M/F.SH-1 Manifold in shuaiba to (X) Manifold in Burgan:

Client: Kuwait Oil Company
Closing date: 08.02.2005
Official Gazette No.697

18 local companies including ARABI ENERTECH are qualified to bid for this tender.

2.








Supply & Installation of Measurement System, Control System and Injection System for Anti-corrosion materials in 14 Gathering Centers in South East Kuwait:

Client: Kuwait Oil Company
Closing date: 08.03.2005
Official Gazette No.697

18 local companies including ARABI ENERTECH are qualified to bid for this project.

3.








Supply & Installation of Compressor (S-12-02) and Reactor (V-12-01) for Kerosene Treating Unit at Shuaiba Refinery:

Client: Kuwait National Petroleum Company
Closing date: 16.01.2005
Official Gazette No.697

8 local companies including ARABI ENERTECH are qualified to bid for this project.

4.








Supply & Installation of 8 motor control boards in the electrical plants in Shuaiba Refinery:

Client: Ministry of Energy
Closing date: 13.03.2005
Official Gazette No.699

9 local companies including ARABI ENERTECH are qualified to bid for this project.

5.












Supply of Ductile Iron Pipes and Couplings:

Client: Ministry of Energy
Closing date: 22.02.2005
Official Gazette No.700

The following companies are qualified to bid for this project:

1. American Cast Iron Pipes, USA\
2. Kubota Ltd., Japan
3. Schalker Verein GmbH, Germany
4. Pont Moussonsa, France

6.



















Supply & Installation of Main Transformer Stations 132/11 KV for Al-Khairan Pearls A&B:

Client: Ministry of Energy
Closing date: 08.03.2005
Official Gazette No.700

The following companies are qualified to bid for this project:

1. Siemens, Germany
2. ABB, Germany
3. AE Power Systems/Hitachi Joint Venture, Japan
4. Areva, France
5. TMT & D Corporation, Japan
6. Ganz Transelekctro, Hungary
7. Merlin Gerin, France
8. Ansaldo, Italy
9. VA Tech
10. Hyundai Heavy Industries, Korea

7.
















Update project of the expired instruments (MOAP) at Mina Al-Ahmadi Refinery:

Client: Kuwait National Petroleum Company
Closing date: 01.05.2005
Official Gazette No.700

Following Companies are qualified to bid for this project:

1. Petrofac International, UAE
2. Technip, Italy
3. Englobal Engineering, USA
4. Amec Group, UK
5. Dutco McConnel Dowell, UAE
6. Integral Services Co., Kuwait
7. IMCO, Kuwait
8. Heavy Engineering Industries, Kuwait.


Pre-Qualifications









The DIVIDED ZONE AGREEMENTS & KUWAITI ISLANDS & MEGA PROJECTS DEVEOLOPMENT TEAM of the Government of Kuwait has announced a pre-qualification to qualify international and local companies classified as “Grade 1 – Roads & Bridges” , with similar experience to undertake the works of Stage-1 of Boubyan Sea Port Project.

The Stage-1 of the Project will comprise of the following:

1. Main Road – From east side of Boubyan Island to Khor Subbiya on the west side      (approximate length : 34 km)
2. Landfill and soil improvement – required for the main road (approximately 4 million cubic      meters).
3. Bridge connecting main road with existing roads network (approximate length 1.4 km).

The last date for submission of the prequalification documents is 1st March 2005.


Get Represented in Kuwait


    ARABI ENERTECH represents several internationally reputed companies in Kuwait. Being a company in operation for 25 years with good reputation and contacts with all major clients in Kuwait such as Kuwait National Petroleum Company (KNPC), Kuwait Oil Company (KOC), Petrochemical Industries Company (PIC), Ministry of Electricity & Water and various other ministries.
ARABI ENERTECH will be more than pleased to represent any international company of repute and promote their products/services in Kuwait market, provided their products are not represented by us from our other principals.

    If interested, you may please contact us on e-mail: trading@arabienertech.com.



For your thought...

1. Always go to other people’s funerals, otherwise they won’t come to yours. --Yogi Berra 

2. My riches consist not in the extent of my possessions, but in the fewness of my wants.  
    --J. Brotherton

3. The most important thing about having goals is having one . --Geoffrey F. Albert

4. It is in the character of very few men to honor without envy a friend, who has prospered.       
    --Aeschylus.
   


Laughter...the best medicine

1. Acronyms for International Airlines:
    ALITALIA, Italy :
    Always Late In The Air, Late In Arrival
    BOAC, Britain
    Better On A Camel
    SABENA, Belgium
    Such A Bad Experience, Never Again
    PWA (Pacific Western Airlines)
    Pray While Aloft
    TWA (Trans-world Airlines)
    Teeney Weeny Airlines

2. Quote from a Company Meeting: “We are going to continue having these meetings, until we find .
    out why no work is getting done”.

3. HR Manager to Candidate: “ I see that you’ve had no computer training. Although that qualifies
    you for upper management, it means you’re under-qualified for our entry level positions.

4. Patient: “It must be tough spending all day with your hands in someone’s mouth”.
    Dentist: “I just think of it as having my hands in their wallet”.

<<Previous

P.O.Box 9831 Ahmadi, Kuwait. Ph: +965 3986083 Fax: +965 3986522 email : enertech@arabienertech.com
© Arabi Enertech K.S.C - Kuwait 2005